07/24/2015 - 07/24/2015
08:00 am to 04:00 pm Friday
The Van Asche Dr Extension Project will require an alteration & realignment of the 3-way intersection of Hwy 112 & Van Asche Drive. Drivers should expect disruptions to traffic flow as crews work within the intersection paving & installing stop signs. Please use extreme caution when in the work area and watch for personnel & equipment. The construction will change the intersection of Highway 112 & Van Asche Drive from the current configuration to a 3-way stop. Drivers are also asked to continue to use caution when traveling in the area due to the realignment and creation of a 3-way stop at the intersection.