Fairlane/Elmhurst/McClinton St area

Map of the Fairlane Elmhurst McClinton affected area

What is the Project?

Improvements to manage storm water from north of Fairlane Street to McClinton Street (Ward 1), generally along Elmhurst Ave. Potential solutions could include the installation of a storm drainage system and improvements to the existing open channel to convey runoff safely through the area.

Why is it Important?

To alleviate flooding in several structures in the area from drainage that flows from the north. Flooding occurs due to a lack of adequate storm drainage system through the area.

What is the Status?

Pending

How is it Funded?

Funding for this project comes from the Bond issue passed by voters in April, 2019.